HomeConstructionPart of Reykjalundur may have to be demolished

Part of Reykjalundur may have to be demolished

Around 20% of Reykjalundur’s premises remain closed because of maintenance problems, and it has not been ruled out that parts of the buildings where mold has been detected will have to be demolished.

Svana Helen Björnsdóttir, CEO of Reykjalundur, says no decision has yet been made on what will happen to all the building sections that remain closed.

“Something will simply have to be demolished. I expect that we will demolish some of what is beyond repair,” she told mbl.is.

She says that in some places the mold is coming from the ground and rising into the building’s foundation and floor slab. Drainage was not installed everywhere around the building when it was constructed, meaning that it may not be possible to repair all of the mold-affected premises.

An earlier BYGGINGAR.IS report covered the closure of 20% of all Reykjalundur premises because of maintenance needs.

Originally published in Icelandic on BYGGINGAR.IS.

Google search engine
RELATED ARTICLES
- Advertisment -
Google search engine

Most Popular

Recent Comments